MDTA Home
  • I-95 at Belvidere Road Transporation Improvement Study Virtual Project Update
  • Bay Bridge AET
  • COVID-19 aet
  • Bay Bridge Success - All Westbound Lanes Open
  • I-895 Bridge Project - Follow link to learn more.
  • I-95 Travel Plaza updates: Follow link to learn more
  • COVID-19 aet
  • I-895 Bridge Project - Follow link to learn more.
  • I-95 Travel Plaza updates: Follow link to learn more
  • Bay Bridge Success - All Westbound Lanes Open

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.

WORK TO RESULT IN OVERNIGHT CLOSURES OF RAMP FROM I-395 TO NORTHBOUND I-95 THIS WEEK

FOR IMMEDIATE RELEASE

Sept. 21, 2015

Contact:         John Sales

                        410-537-1017

 

WORK TO RESULT IN OVERNIGHT CLOSURES OF

RAMP FROM I-395 TO NORTHBOUND I-95 THIS WEEK

 

Tags: 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMP FROM SOUTHBOUND I-95 TO NORTHBOUND I-395 IN BALTIMORE CITY DURING SEPTEMBER

FOR IMMEDIATE RELEASE

Sept. 18, 2015 BB

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMP FROM SOUTHBOUND I-95 TO NORTHBOUND I-395 IN BALTIMORE CITY

DURING SEPTEMBER

 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Sept. 20 - 26, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 20 - 26, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

(I-895) Baltimore Harbor Tunnel Lane Closures for the Week of Sept. 21, 2015

For Immediate Release

Facility: (I-895) Baltimore Harbor Tunnel

During tunnel closures at the (I-895) Baltimore Harbor Tunnel, drivers may experience 15-20 minute delays while two-way operations (during which one lane of southbound and northbound traffic is directed into the tunnel that remains open) are implemented. Closure times are dependent on traffic volumes.

FORT MCHENRY TUNNEL 5K RUN/WALK ON SEPT. 20 TO BENEFIT SPECIAL OLYMPICS MARYLAND

FOR IMMEDIATE RELEASE
Sept. 17, 2015
 
 

FORT MCHENRY TUNNEL 5K RUN/WALK ON SEPT. 20 TO BENEFIT SPECIAL OLYMPICS MARYLAND

Minimal Delays Expected During Off-Peak Closures and 5K Event

 

Tags: 

**UPDATED** WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEK

FOR IMMEDIATE RELEASE

Sept. 14, 2015 BB

 

**UPDATED**

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEK

 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Sept. 13 - 19, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 13 - 19, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEKEND INTO NEXT WEEK

FOR IMMEDIATE RELEASE

Sept. 11, 2015 BB

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEKEND INTO NEXT WEEK

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEK

FOR IMMEDIATE RELEASE

Sept. 8, 2015 BB

 

WORK TO RESULT IN TEMPORARY OVERNIGHT CLOSURES OF RAMPS FROM SOUTHBOUND I-95 IN BALTIMORE CITY THIS WEEK

 

WHAT: The ramp from southbound I-95 to northbound I-395 (Exit 53) will be closed temporarily to traffic.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Sept. 8 - 12, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 8 - 12, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

Pages

S M T W T F S
 
 
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 

Click to Translate:

Translation Disclaimer

Toll Rate Calculator

Toll Rate Calculator

Toll rates by vehicles, times, and facilities.

E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.